Safety Measures w.r.t. Building and Environment MCQs – CHAPTER 10 DAE 21 min Score: 0 Attempted: 0/21 Subscribe 1. .1: An association controlling accidents in any project. (A) Safety Committee (B) Management (C) Workers Union (D) Rescue 1122Show All Answers 2. .2: Safety Measure against accidents. (A) Safety Committee (B) Safety Habits (C) Safety Campaign (D) All of theseShow All Answers 3. .3: Arrangement of suitable Light at site. (A) Ventilation (B) Illumination (C) Flux (D) Natural LightShow All Answers 4. .4: Arrangement of fresh Air at site. (A) Blower (B) Illumination (C) Flux (D) VentilationShow All Answers 5. .5: Main sources of noise. (A) Industries (B) Transport (C) House hold (D) All of theseShow All Answers 6. .6: Physical bad effect of noise. (A) All of these (B) Deaf (C) Shrinkage of arteries (D) HeadacheShow All Answers 7. .7: Psychological bad effect of noise. (A) Deaf (B) Depression (C) Headache (D) All of theseShow All Answers 8. .8: Method of Noise Control. (A) All of these (B) Use of new machinery (C) Use of earmuff (D) InsulationShow All Answers 9. .9: Alarm system is used for in buildings. (A) Water Flow (B) Ventilation (C) Fire (D) All of theseShow All Answers 10. .10: Fire extinguishing arrangement. (A) Fire Control Devices (B) Fire hydrant (C) Emergency Alarming system (D) All of theseShow All Answers 11. .11: Basic Components of Scaffolding is. (A) Ledgers (B) Sole plates (C) Clamps (D) BattensShow All Answers 12. .12: Surface used to shape the wet concrete is called. (A) Die (B) Form work (C) Mould (D) PanelShow All Answers 13. .13: Structure consisting of two side bars between a series of bar/ring set at suitable distance is called. (A) Ladder (B) Crowbar (C) Runner (D) StairShow All Answers 14. .14: Temporary platform used to hold the wet concrete is called. (A) Formwork (B) Shuttering (C) Pilling (D) DrillingShow All Answers 15. .15: Method of timbering is. (A) Bracing (B) Sheeting (C) Piling (D) All of theseShow All Answers 16. .16: Mostly used form work in ordinary concrete work. (A) Aluminum (B) Steel (C) Wooden (D) FabricShow All Answers 17. .17: Continued type of formwork is called. (A) Sheet formwork (B) Jump formwork (C) Panel formwork (D) Slip formworkShow All Answers 18. .18: Steel ladder did not used for. (A) Plumbing work (B) Electric work (C) Sheeting work (D) Form workShow All Answers 19. .19: Component of timbering is. (A) Strut (B) All of these (C) Wedges (D) PollingShow All Answers 20. .20: Method for operation of blasting is. (A) All of these (B) Drilling (C) Detonating the charge (D) Clearing wayShow All Answers 21. .21: Removal of ground water from construction site is called. (A) Pumping (B) Dewatering (C) Removing (D) All of theseShow All Answers