T4Tutorials .PK

Safety Measures w.r.t. Building and Environment MCQs – CHAPTER 10 DAE

1. .1: An association controlling accidents in any project.

(A) Safety Committee


(B) Management


(C) Workers Union


(D) Rescue 1122




2. .2: Safety Measure against accidents.

(A) Safety Committee


(B) Safety Habits


(C) Safety Campaign


(D) All of these




3. .3: Arrangement of suitable Light at site.

(A) Ventilation


(B) Illumination


(C) Flux


(D) Natural Light




4. .4: Arrangement of fresh Air at site.

(A) Blower


(B) Illumination


(C) Flux


(D) Ventilation




5. .5: Main sources of noise.

(A) Industries


(B) Transport


(C) House hold


(D) All of these




6. .6: Physical bad effect of noise.

(A) All of these


(B) Deaf


(C) Shrinkage of arteries


(D) Headache




7. .7: Psychological bad effect of noise.

(A) Deaf


(B) Depression


(C) Headache


(D) All of these




8. .8: Method of Noise Control.

(A) All of these


(B) Use of new machinery


(C) Use of earmuff


(D) Insulation




9. .9: Alarm system is used for in buildings.

(A) Water Flow


(B) Ventilation


(C) Fire


(D) All of these




10. .10: Fire extinguishing arrangement.

(A) Fire Control Devices


(B) Fire hydrant


(C) Emergency Alarming system


(D) All of these




11. .11: Basic Components of Scaffolding is.

(A) Ledgers


(B) Sole plates


(C) Clamps


(D) Battens




12. .12: Surface used to shape the wet concrete is called.

(A) Die


(B) Form work


(C) Mould


(D) Panel




13. .13: Structure consisting of two side bars between a series of bar/ring set at suitable distance is called.

(A) Ladder


(B) Crowbar


(C) Runner


(D) Stair




14. .14: Temporary platform used to hold the wet concrete is called.

(A) Formwork


(B) Shuttering


(C) Pilling


(D) Drilling




15. .15: Method of timbering is.

(A) Bracing


(B) Sheeting


(C) Piling


(D) All of these




16. .16: Mostly used form work in ordinary concrete work.

(A) Aluminum


(B) Steel


(C) Wooden


(D) Fabric




17. .17: Continued type of formwork is called.

(A) Sheet formwork


(B) Jump formwork


(C) Panel formwork


(D) Slip formwork




18. .18: Steel ladder did not used for.

(A) Plumbing work


(B) Electric work


(C) Sheeting work


(D) Form work




19. .19: Component of timbering is.

(A) Strut


(B) All of these


(C) Wedges


(D) Polling




20. .20: Method for operation of blasting is.

(A) All of these


(B) Drilling


(C) Detonating the charge


(D) Clearing way




21. .21: Removal of ground water from construction site is called.

(A) Pumping


(B) Dewatering


(C) Removing


(D) All of these




Exit mobile version