PLANNING SCHEDULING & MONITORING WITH PRIMAVERA P6 MCQs – CHAPTER 6 DAE 10 min Score: 0 Attempted: 0/10 Subscribe 1. 1: Select the most suitable answer of the following questions.What is the main purpose of Primavera P6? (A) All of the above (B) Resource allocation (C) Cost estimation (D) Project planning and schedulingShow All Answers 2. Primavera P6 is a project management software developed by: (A) Microsoft (B) Oracle (C) IBM (D) SAPShow All Answers 3. Primavera P6 can be used to: (A) All of the above (B) Track project progress (C) Analyze project data (D) Create project plansShow All Answers 4. What is the first step in creating a project in Primavera P6? (A) Create a new project file (B) Define the project scope (C) Identify the project resources (D) Create a project scheduleShow All Answers 5. The difference between the time available to do a job and the time required to do the job is known as: (A) Event (B) Float (C) Duration (D) ConstraintShow All Answers 6. (A) dummy activity: (A) Is artificially introduced (B) Is represented by a dotted line (C) All of above (D) Does not consume timeShow All Answers 7. Method of monitoring a running project in Primavera: (A) Sort (B) Filter (C) Copy (D) ThresholdShow All Answers 8. Resource used in a project: (A) Material (B) Machinery (C) Manpower (D) All of theseShow All Answers 9. Example of role in Primavera: (A) Carpenter (B) Filter (C) Enterprise (D) All of theseShow All Answers 10. Method of formatting project data in Primavera: (A) Cut (B) Paste (C) Filter (D) All of theseShow All Answers