PLANNING SCHEDULING & MONITORING WITH PRIMAVERA P6 MCQs – CHAPTER 6 DAE

1. 1: Select the most suitable answer of the following questions.
What is the main purpose of Primavera P6?

(A) All of the above


(B) Resource allocation


(C) Cost estimation


(D) Project planning and scheduling




2. Primavera P6 is a project management software developed by:

(A) Microsoft


(B) Oracle


(C) IBM


(D) SAP




3. Primavera P6 can be used to:

(A) All of the above


(B) Track project progress


(C) Analyze project data


(D) Create project plans




4. What is the first step in creating a project in Primavera P6?

(A) Create a new project file


(B) Define the project scope


(C) Identify the project resources


(D) Create a project schedule




5. The difference between the time available to do a job and the time required to do the job is known as:

(A) Event


(B) Float


(C) Duration


(D) Constraint




6.

(A) dummy activity:


(A) Is artificially introduced


(B) Is represented by a dotted line


(C) All of above


(D) Does not consume time




7. Method of monitoring a running project in Primavera:

(A) Sort


(B) Filter


(C) Copy


(D) Threshold




8. Resource used in a project:

(A) Material


(B) Machinery


(C) Manpower


(D) All of these




9. Example of role in Primavera:

(A) Carpenter


(B) Filter


(C) Enterprise


(D) All of these




10. Method of formatting project data in Primavera:

(A) Cut


(B) Paste


(C) Filter


(D) All of these