INTRODUCTION TO MOLD MCQs – CHAPTER 12 DAE 10 min Score: 0 Attempted: 0/10 Subscribe 1. . A gating system refers to the channels through which the molten metal flows to the mold cavity (A) Mold cavity (B) Gating system (C) Ingate (D) RiserShow All Answers 2. . The vertical portion of the gating system is (A) Runner (B) Ingate (C) Mold cavity (D) SprueShow All Answers 3. . The funnel shape opening at top of sprue is called (A) Sprue (B) Ingate (C) Runner (D) Pouring basinShow All Answers 4. . Horizontal portion of the gating system is (A) Sprue (B) Runner (C) Ingate (D) RiserShow All Answers 5. . It opens in mold cavity and feeds molten metal into it (A) Runner (B) Riser (C) Pouring basin (D) IngateShow All Answers 6. . To compensate for shrinkage during solidification process ----- fills molten metal to mold (A) Riser (B) Ingate (C) Runner (D) SprueShow All Answers 7. . The upper part of mold is called (A) Drag (B) Cheek (C) Cope (D) RunnerShow All Answers 8. . The lower part of mold is called (A) Cheek (B) Drag (C) Runner (D) SprueShow All Answers 9. . The middle part of mold is called (A) Drag (B) Runner (C) Cheek (D) CopeShow All Answers 10. . The molten metal enters into mold cavity through (A) Ingate (B) Runner (C) Riser (D) SprueShow All Answers