1. . A gating system refers to the channels through which the molten metal flows to the mold cavity
(A) Mold cavity
(B) Gating system
(C) Ingate
(D) Riser
2. . The vertical portion of the gating system is
(A) Runner
(B) Ingate
(C) Mold cavity
(D) Sprue
3. . The funnel shape opening at top of sprue is called
(A) Sprue
(B) Ingate
(C) Runner
(D) Pouring basin
4. . Horizontal portion of the gating system is
(A) Sprue
(B) Runner
(C) Ingate
(D) Riser
5. . It opens in mold cavity and feeds molten metal into it
(A) Runner
(B) Riser
(C) Pouring basin
(D) Ingate
6. . To compensate for shrinkage during solidification process ----- fills molten metal to mold
(A) Riser
(B) Ingate
(C) Runner
(D) Sprue
7. . The upper part of mold is called
(A) Drag
(B) Cheek
(C) Cope
(D) Runner
8. . The lower part of mold is called
(A) Cheek
(B) Drag
(C) Runner
(D) Sprue
9. . The middle part of mold is called
(A) Drag
(B) Runner
(C) Cheek
(D) Cope
10. . The molten metal enters into mold cavity through
(A) Ingate
(B) Runner
(C) Riser
(D) Sprue