Chapter 7 FALSE WORK MCQs 9 min Score: 0 Attempted: 0/9 Subscribe 1. Temporary supports for desired shape of fresh concrete. (A) Floor (B) Mason (C) Form work (D) LaborShow All Answers 2. Vertical supports of formwork are called: (A) Waling (B) Yoke (C) Joist (D) PropsShow All Answers 3. For fine and decorative finish the formwork used is: (A) Wooden (B) Steel (C) Fiber (D) CompositeShow All Answers 4. To strengthen the props of formwork are used. (A) Braces (B) Joist (C) Planks (D) YokeShow All Answers 5. Oblique members of scaffolding which supports the standards are. (A) Braces (B) Ledger (C) Putlogs (D) TransomShow All Answers 6. Replacing the foundation of an existing building: (A) Timbering (B) Shoring (C) All of these (D) UnderpinningShow All Answers 7. Temporary supports provided for an unsafe structure: (A) Shoring (B) Scaffolding (C) Pillars (D) PutlogsShow All Answers 8. Vertical members of scaffolding are called: (A) Putlogs (B) Ledgers (C) Standards (D) TransomShow All Answers 9. Double scaffolding is mostly used in the construction of: (A) Brick masonry (B) Stone masonry (C) Both a and b (D) FoundationShow All Answers