Chapter 7 FALSE WORK MCQs

9 min Score: 0 Attempted: 0/9 Subscribe
1. Temporary supports for desired shape of fresh concrete.





2. Vertical supports of formwork are called:





3. For fine and decorative finish the formwork used is:





4. To strengthen the props of formwork are used.





5. Oblique members of scaffolding which supports the standards are.





6. Replacing the foundation of an existing building:





7. Temporary supports provided for an unsafe structure:





8. Vertical members of scaffolding are called:





9. Double scaffolding is mostly used in the construction of: