Chapter 7 FALSE WORK MCQs

1. Temporary supports for desired shape of fresh concrete.

(A) Floor


(B) Mason


(C) Form work


(D) Labor




2. Vertical supports of formwork are called:

(A) Waling


(B) Yoke


(C) Joist


(D) Props




3. For fine and decorative finish the formwork used is:

(A) Wooden


(B) Steel


(C) Fiber


(D) Composite




4. To strengthen the props of formwork are used.

(A) Braces


(B) Joist


(C) Planks


(D) Yoke




5. Oblique members of scaffolding which supports the standards are.

(A) Braces


(B) Ledger


(C) Putlogs


(D) Transom




6. Replacing the foundation of an existing building:

(A) Timbering


(B) Shoring


(C) All of these


(D) Underpinning




7. Temporary supports provided for an unsafe structure:

(A) Shoring


(B) Scaffolding


(C) Pillars


(D) Putlogs




8. Vertical members of scaffolding are called:

(A) Putlogs


(B) Ledgers


(C) Standards


(D) Transom




9. Double scaffolding is mostly used in the construction of:

(A) Brick masonry


(B) Stone masonry


(C) Both a and b


(D) Foundation