Chapter 3 ESTIMATING MCQs 20 min Score: 0 Attempted: 0/20 Subscribe 1. . The cost estimation before the electrical installation is called (A) Cost estimation (B) Project planning (C) Installation (D) AllShow All Answers 2. . It is essential before the electrical installation (A) Planning (B) Cost estimation (C) Feasibility (D) AllShow All Answers 3. . In contracting, the process has fundamental value (A) Cost estimating (B) Planning (C) Designing (D) AllShow All Answers 4. . The cost estimation of electrical installation is for (A) All (B) Work will not stop (C) Material estimation (D) CostShow All Answers 5. . In cost estimation we estimates; (A) Total Cost (B) Cost of material (C) Labour required (D) AllShow All Answers 6. . In layout plan the color used for power circuit is (A) Red (B) Blue (C) Yellow (D) BlackShow All Answers 7. . The profit percentage of a contractor of an electrical project is fixed by (A) Officer of that office (B) Own self (C) Already fixed value (D) NoneShow All Answers 8. . An estimator knows about (A) Estimate (B) Material cost (C) All (D) Tools and table usedShow All Answers 9. . The map measure looks like (A) AVO meter (B) Watch (C) Megger (D) None of themShow All Answers 10. . The delay in the electrical project can increase (A) Material cost (B) Extra cost (C) Supervision cost (D) Accidental costShow All Answers 11. . The cost is included in the extra expense (A) Post and Travel (B) a & b (C) Material cost (D) ElectricityShow All Answers 12. . The material cost depends on (A) a & b (B) Site distance from market (C) Type of Project (D) Quality of materialShow All Answers 13. . Electrical tables are used in (A) Installation (B) Planning (C) Estimation (D) b & cShow All Answers 14. . In electrical projects, it is used in planning and estimation (A) Experiments (B) Tables (C) Tools (D) Electrical equipmentShow All Answers 15. . The diversity factor is used to find out (A) Service cable (B) Branch cables (C) Main and sub-main cables (D) AllShow All Answers 16. . The tools used for measurement of transmission lines, feeders and branch circuits (A) Steel tape (B) Scale (C) Tape measure (D) Map measureShow All Answers 17. . It’s not an estimating tool (A) AVO meter (B) Sliding rule (C) Tape measure (D) TallyShow All Answers 18. . It’s an essential process for electrical projects (A) Building layout (B) Type of wiring (C) Cost estimation (D) AllShow All Answers 19. . The labour cost can effects due to (A) Condition of work place (B) All (C) Cooperation (D) Weather conditionsShow All Answers 20. . The labour cost is percentage of a total cost (A) 15% - 20% (B) 20% (C) 25% (D) None of themShow All Answers