T4Tutorials .PK

Chapter 3 ESTIMATING MCQs

1. . The cost estimation before the electrical installation is called

(A) Cost estimation


(B) Project planning


(C) Installation


(D) All




2. . It is essential before the electrical installation

(A) Planning


(B) Cost estimation


(C) Feasibility


(D) All




3. . In contracting, the process has fundamental value

(A) Cost estimating


(B) Planning


(C) Designing


(D) All




4. . The cost estimation of electrical installation is for

(A) All


(B) Work will not stop


(C) Material estimation


(D) Cost




5. . In cost estimation we estimates;

(A) Total Cost


(B) Cost of material


(C) Labour required


(D) All




6. . In layout plan the color used for power circuit is

(A) Red


(B) Blue


(C) Yellow


(D) Black




7. . The profit percentage of a contractor of an electrical project is fixed by

(A) Officer of that office


(B) Own self


(C) Already fixed value


(D) None




8. . An estimator knows about

(A) Estimate


(B) Material cost


(C) All


(D) Tools and table used




9. . The map measure looks like

(A) AVO meter


(B) Watch


(C) Megger


(D) None of them




10. . The delay in the electrical project can increase

(A) Material cost


(B) Extra cost


(C) Supervision cost


(D) Accidental cost




11. . The cost is included in the extra expense

(A) Post and Travel


(B) a & b


(C) Material cost


(D) Electricity




12. . The material cost depends on

(A) a & b


(B) Site distance from market


(C) Type of Project


(D) Quality of material




13. . Electrical tables are used in

(A) Installation


(B) Planning


(C) Estimation


(D) b & c




14. . In electrical projects, it is used in planning and estimation

(A) Experiments


(B) Tables


(C) Tools


(D) Electrical equipment




15. . The diversity factor is used to find out

(A) Service cable


(B) Branch cables


(C) Main and sub-main cables


(D) All




16. . The tools used for measurement of transmission lines, feeders and branch circuits

(A) Steel tape


(B) Scale


(C) Tape measure


(D) Map measure




17. . It’s not an estimating tool

(A) AVO meter


(B) Sliding rule


(C) Tape measure


(D) Tally




18. . It’s an essential process for electrical projects

(A) Building layout


(B) Type of wiring


(C) Cost estimation


(D) All




19. . The labour cost can effects due to

(A) Condition of work place


(B) All


(C) Cooperation


(D) Weather conditions




20. . The labour cost is percentage of a total cost

(A) 15% - 20%


(B) 20%


(C) 25%


(D) None of them




Exit mobile version