1. . The cost estimation before the electrical installation is called
(A) Cost estimation
(B) Project planning
(C) Installation
(D) All
2. . It is essential before the electrical installation
(A) Planning
(B) Cost estimation
(C) Feasibility
(D) All
3. . In contracting, the process has fundamental value
(A) Cost estimating
(B) Planning
(C) Designing
(D) All
4. . The cost estimation of electrical installation is for
(A) All
(B) Work will not stop
(C) Material estimation
(D) Cost
5. . In cost estimation we estimates;
(A) Total Cost
(B) Cost of material
(C) Labour required
(D) All
6. . In layout plan the color used for power circuit is
(A) Red
(B) Blue
(C) Yellow
(D) Black
7. . The profit percentage of a contractor of an electrical project is fixed by
(A) Officer of that office
(B) Own self
(C) Already fixed value
(D) None
8. . An estimator knows about
(A) Estimate
(B) Material cost
(C) All
(D) Tools and table used
9. . The map measure looks like
(A) AVO meter
(B) Watch
(C) Megger
(D) None of them
10. . The delay in the electrical project can increase
(A) Material cost
(B) Extra cost
(C) Supervision cost
(D) Accidental cost
11. . The cost is included in the extra expense
(A) Post and Travel
(B) a & b
(C) Material cost
(D) Electricity
12. . The material cost depends on
(A) a & b
(B) Site distance from market
(C) Type of Project
(D) Quality of material
13. . Electrical tables are used in
(A) Installation
(B) Planning
(C) Estimation
(D) b & c
14. . In electrical projects, it is used in planning and estimation
(A) Experiments
(B) Tables
(C) Tools
(D) Electrical equipment
15. . The diversity factor is used to find out
(A) Service cable
(B) Branch cables
(C) Main and sub-main cables
(D) All
16. . The tools used for measurement of transmission lines, feeders and branch circuits
(A) Steel tape
(B) Scale
(C) Tape measure
(D) Map measure
17. . It’s not an estimating tool
(A) AVO meter
(B) Sliding rule
(C) Tape measure
(D) Tally
18. . It’s an essential process for electrical projects
(A) Building layout
(B) Type of wiring
(C) Cost estimation
(D) All
19. . The labour cost can effects due to
(A) Condition of work place
(B) All
(C) Cooperation
(D) Weather conditions
20. . The labour cost is percentage of a total cost
(A) 15% - 20%
(B) 20%
(C) 25%
(D) None of them