Order PDF of any content from our website with a little minor Fee to donate for hard work. Online MCQs are fully free but PDF books are paid. For details: contact whatsapp +923028700085 Important notes based PDF Books are available in very little price, starting from 500/-PKR; Order Now: contact whatsapp +923028700085

Chapter 3 BUILDING ESTIMATE MCQs

16 min Score: 0 Attempted: 0/16 Subscribe
1. . Such estimate is prepared to get administrative approval.





2. . Such estimate is prepared to get technical sanction.





3. . Area occupied by this is included in the plinth area estimate.





4. . Detailed estimate is also called ______ estimate.





5. . Long and short wall method of estimating is also called:





6. . For circular or polygonal shaped building with symmetrical section of wall, this method of estimating is most suitable:





7. . Length, breadth, heights are written combined in this method:





8. . To get length of a step of straight wall, the difference of widths of the step and of step at superstructure is ________ in original length.





9. . Difference of widths of required step and step at superstructure is ________ to get the length of middle wall of "H" shaped wall.





10. . Half width is subtracted at each end of middle wall in method of estimating:





11. . In the case of shape wall, the length of each step of perpendicular wall remains constant for:





12. . In an ordinary type of building, the cost of materials comes to about ________ of the total cost of the whole building.





13. . Which is the unit of payment of DPC?





14. . The measuring unit of brick on edging is:





15. . Concrete used in foundation is:





16. . Amount for the contingencies is taken ______ of building cost:





Contents Copyrights Reserved By T4Tutorials