1. . Such estimate is prepared to get administrative approval.

(A) Detailed


(B) Rough Cost


(C) Revised


(D) All of these




2. . Such estimate is prepared to get technical sanction.

(A) Detailed


(B) Rough Cost


(C) Revised


(D) All of these




3. . Area occupied by this is included in the plinth area estimate.

(A) All of these


(B) Sunshade


(C) Courtyard


(D) Walls




4. . Detailed estimate is also called ______ estimate.

(A) Item rate


(B) Revised


(C) Rough cost


(D) All of these




5. . Long and short wall method of estimating is also called:

(A) Out to out and in to in


(B) Revised


(C) Supplement


(D) Centre line




6. . For circular or polygonal shaped building with symmetrical section of wall, this method of estimating is most suitable:

(A) Out to out and in to in


(B) Crossing


(C) Supplementary


(D) Centre line




7. . Length, breadth, heights are written combined in this method:

(A) Separate wall


(B) English


(C) Centre line


(D) P.W.D.




8. . To get length of a step of straight wall, the difference of widths of the step and of step at superstructure is ________ in original length.

(A) Subtracted


(B) Added


(C) Multiplied


(D) Divided




9. . Difference of widths of required step and step at superstructure is ________ to get the length of middle wall of "H" shaped wall.

(A) Multiplied


(B) Added


(C) Subtracted


(D) Divided




10. . Half width is subtracted at each end of middle wall in method of estimating:

(A) Supplement


(B) Crossing


(C) Centre line


(D) Out to out and in to in




11. . In the case of shape wall, the length of each step of perpendicular wall remains constant for:

(A) H


(B) U


(C) E


(D) O




12. . In an ordinary type of building, the cost of materials comes to about ________ of the total cost of the whole building.

(A) 40%


(B) 50%


(C) 60%


(D) 70%




13. . Which is the unit of payment of DPC?

(A) Cubic feet


(B) Square feet


(C) 100 cubic feet


(D) 100 square meter




14. . The measuring unit of brick on edging is:

(A) cft


(B) sft


(C) m


(D) cu.m




15. . Concrete used in foundation is:

(A) 1:6:12


(B) 1:1.5:3


(C) 1:2:4


(D) 1:1:2




16. . Amount for the contingencies is taken ______ of building cost:

(A) 2-3%


(B) 3-49%


(C) 1-2%


(D) 3-5%