1. . Such estimate is prepared to get administrative approval.
(A) Detailed
(B) Rough Cost
(C) Revised
(D) All of these
2. . Such estimate is prepared to get technical sanction.
(A) Detailed
(B) Rough Cost
(C) Revised
(D) All of these
3. . Area occupied by this is included in the plinth area estimate.
(A) All of these
(B) Sunshade
(C) Courtyard
(D) Walls
4. . Detailed estimate is also called ______ estimate.
(A) Item rate
(B) Revised
(C) Rough cost
(D) All of these
5. . Long and short wall method of estimating is also called:
(A) Out to out and in to in
(B) Revised
(C) Supplement
(D) Centre line
6. . For circular or polygonal shaped building with symmetrical section of wall, this method of estimating is most suitable:
(A) Out to out and in to in
(B) Crossing
(C) Supplementary
(D) Centre line
7. . Length, breadth, heights are written combined in this method:
(A) Separate wall
(B) English
(C) Centre line
(D) P.W.D.
8. . To get length of a step of straight wall, the difference of widths of the step and of step at superstructure is ________ in original length.
(A) Subtracted
(B) Added
(C) Multiplied
(D) Divided
9. . Difference of widths of required step and step at superstructure is ________ to get the length of middle wall of "H" shaped wall.
(A) Multiplied
(B) Added
(C) Subtracted
(D) Divided
10. . Half width is subtracted at each end of middle wall in method of estimating:
(A) Supplement
(B) Crossing
(C) Centre line
(D) Out to out and in to in
11. . In the case of shape wall, the length of each step of perpendicular wall remains constant for:
(A) H
(B) U
(C) E
(D) O
12. . In an ordinary type of building, the cost of materials comes to about ________ of the total cost of the whole building.
(A) 40%
(B) 50%
(C) 60%
(D) 70%
13. . Which is the unit of payment of DPC?
(A) Cubic feet
(B) Square feet
(C) 100 cubic feet
(D) 100 square meter
14. . The measuring unit of brick on edging is:
(A) cft
(B) sft
(C) m
(D) cu.m
15. . Concrete used in foundation is:
(A) 1:6:12
(B) 1:1.5:3
(C) 1:2:4
(D) 1:1:2
16. . Amount for the contingencies is taken ______ of building cost:
(A) 2-3%
(B) 3-49%
(C) 1-2%
(D) 3-5%