Chapter 2 SITE PREPARATION AND SETTING OUT OF WORKS MCQs 10 min Score: 0 Attempted: 0/10 Subscribe 1. Work place of any civil engineering projects is called: (A) Lay out (B) Side (C) Site (D) ColonyShow All Answers 2. Place where material is stored: (A) Godown (B) Site (C) Gate (D) Work shopShow All Answers 3. Factor affecting site layout: (A) Nature of work (B) All of these (C) Work availability of labor (D) Method of constructionShow All Answers 4. Electric current is used in the method of exclusion of ground water: (A) In sump pumping (B) In horizontal control (C) In well point system (D) In electro osmosisShow All Answers 5. Cost of ordinary building foundation is considered to be of total cost of construction: (A) 1/4 (B) 1/3 (C) 1/2 (D) 1/5Show All Answers 6. Location of offices preferred in site layout is near: (A) The labor colony (B) The exit (C) The entrance (D) All of theseShow All Answers 7. Location of labor colony is preferred in site layout near the: (A) Entrance (B) Exit (C) All of these (D) Back siteShow All Answers 8. Best location of administrative block in site plan is near the: (A) Entrance (B) Exit (C) Labor colony (D) Central placeShow All Answers 9. Place where building is constructed: (A) Site layout (B) Side (C) Site (D) None of theseShow All Answers 10. Method of permanent exclusion of ground water: (A) All of these (B) Grout injection (C) Continuous pile (D) Diaphragm wallShow All Answers