T4Tutorials .PK

Chapter 2 SITE PREPARATION AND SETTING OUT OF WORKS MCQs

1. Work place of any civil engineering projects is called:

(A) Lay out


(B) Side


(C) Site


(D) Colony




2. Place where material is stored:

(A) Godown


(B) Site


(C) Gate


(D) Work shop




3. Factor affecting site layout:

(A) Nature of work


(B) All of these


(C) Work availability of labor


(D) Method of construction




4. Electric current is used in the method of exclusion of ground water:

(A) In sump pumping


(B) In horizontal control


(C) In well point system


(D) In electro osmosis




5. Cost of ordinary building foundation is considered to be of total cost of construction:

(A) 1/4


(B) 1/3


(C) 1/2


(D) 1/5




6. Location of offices preferred in site layout is near:

(A) The labor colony


(B) The exit


(C) The entrance


(D) All of these




7. Location of labor colony is preferred in site layout near the:

(A) Entrance


(B) Exit


(C) All of these


(D) Back site




8. Best location of administrative block in site plan is near the:

(A) Entrance


(B) Exit


(C) Labor colony


(D) Central place




9. Place where building is constructed:

(A) Site layout


(B) Side


(C) Site


(D) None of these




10. Method of permanent exclusion of ground water:

(A) All of these


(B) Grout injection


(C) Continuous pile


(D) Diaphragm wall




Exit mobile version