INSPECTION AND QUALITY CONTROL MCQs – CHAPTER 7 DAE 25 min Score: 0 Attempted: 0/25 Subscribe 1. 1: Encircle the most suitable Answer of the following questions.What is the purpose of inspection in civil works? (A) Safety assurance (B) Risk management (C) Quality control (D) Compliance verificationShow All Answers 2. What does quality control aim to achieve in terms of workmanship? (A) Consistency in workmanship (B) Liability protection (C) Cost control (D) None of theseShow All Answers 3. What is the main benefit of conducting regular inspections in construction work? (A) Risk reduction (B) Quality assurance (C) Cost control (D) Liability protectionShow All Answers 4. Which stage of inspection involves reviewing the design and specifications? (A) Material (B) Workmanship (C) Pre-Construction (D) FinalShow All Answers 5. Which stage of inspection involves monitoring the construction process? (A) Pre-Construction Inspection (B) Testing and Analysis (C) Final Inspection (D) Workmanship InspectionShow All Answers 6. What is the role of a Superintending Engineer (S.E.)? (A) Managing construction projects (B) Providing technical expertise (C) Ensuring compliance (D) Testing materialsShow All Answers 7. What is the responsibility of a Sub Engineer as In charge of Store? (A) Providing advice (B) Managing projects (C) Testing of materials (D) Managing and maintaining inventoryShow All Answers 8. What is the primary duty of a Sub Engineer as In charge of Account? (A) Reviewing construction plans (B) Inspecting construction sites (C) Managing project budgets (D) Coordinating with architectsShow All Answers 9. What does an Executive Engineer (XEN) do during site visits? (A) Monitor quality of construction (B) Produce progress reports (C) Resolve construction issues (D) Test materialsShow All Answers 10. What is a Site Order Book? (A) Register containing orders (B) Property of the company (C) Reference book (D) Important documentShow All Answers 11. Who notes the orders in the Site Order Book? (A) Authorized representative (B) Engineer-in-Charge (C) Contractor (D) CompanyShow All Answers 12. What should a supervisor prioritize to ensure work is completed to the required standards? (A) Progress monitoring (B) Quality control (C) Resource allocation (D) Problem-solvingShow All Answers 13. What is the ultimate goal of supervision in construction work? (A) Successful project (B) Time management (C) Safety procedures (D) Quality standardsShow All Answers 14. What is essential for enforcing specifications on construction work? (A) Compliance (B) Adequate resources (C) Quality control (D) Clear languageShow All Answers 15. What is the purpose of sampling in material testing? (A) Determine properties (B) Ensure safety (C) Verify design (D) Prevent defectsShow All Answers 16. What is necessary to monitor construction work and ensure it meets specifications? (A) Communication (B) Inspection and testing (C) Quality control procedures (D) All of theseShow All Answers 17. What should be maintained to demonstrate the enforcement of specifications? (A) Compliance (B) Communication (C) Documentation (D) Quality control proceduresShow All Answers 18. What should be established to monitor and control the quality of construction work? (A) Quality control procedures (B) Compliance (C) Clear language (D) DocumentationShow All Answers 19. What should be in place for non-compliance with specifications? (A) Compliance (B) Consequences (C) Quality control procedures (D) Adequate resourcesShow All Answers 20. What is important for regular communication in enforcing specifications? (A) Clear language (B) Adequate resources (C) Communication (D) ComplianceShow All Answers 21. Carrying out constructional work according to the specification is called: (A) Execution of work (B) Inspection (C) Quality control (D) Work in progressShow All Answers 22. Art of checking of materials and works done is called: (A) Inspection (B) Quality control (C) Execution of work (D) Work in progressShow All Answers 23. During inspection work done is compared with: (A) Specifications (B) Schedule of work (C) Work in progress (D) Execution of workShow All Answers 24. The planning of inspection should be done: (A) Any time (B) Scheduled (C) Sudden (D) NecessaryShow All Answers 25. The inspection should be organized in such a manner that it can be complete within: (A) Well in time (B) Scheduled time (C) Due time (D) All of theseShow All Answers