RESERVOIRS MCQs – CHAPTER 17 DAE

1. Main purpose of reservoir is:

(A) Irrigation


(B) All of these


(C) Flood control


(D) Navigation




2. Single purpose reservoir is used for:

(A) More than one purpose


(B) One or more than one


(C) One purpose


(D) Two purposes only




3. _____ is a type of reservoir:

(A) All of these


(B) Retarding


(C) Distribution structure


(D) Flood control structure




4. Choose the correct statement:

(A) The area with high sedimentation should be avoided.


(B) At site, valley should be broad and well defined.


(C) Reservoir basin should submerge valuable land.


(D) All of these




5. _____ is a type of dam based on material:

(A) Overflow dam


(B) Arch dams


(C) Rigid dam


(D) Earth filled dam




6. _____ is a type of dam based on design:

(A) Storage dam


(B) Gravity dam


(C) Non-rigid dam


(D) Non overflow dam




7. _______ is factor which affects the selection of dam:

(A) Earthquake zone


(B) Availability of material


(C) All of these


(D) Height of dam




8. Earthen dam is also known as:

(A) Gravity dam


(B) Rigid dam


(C) Detention dam


(D) Embankment dam




9. Pitching prevents ______ in earthen dams.

(A) Slipping


(B) Collect the rain water


(C) Seepage


(D) Sudden draw down




10. Transition filters are provided between:

(A) Clay soil and boulders


(B) Boulders and sandy shell


(C) Clay soil and sandy shell


(D) All of these




11. Hydraulic failure occurs nearly ____ %:

(A) 40


(B) 50


(C) 30


(D) 20




12. Seepage failure occurs nearly ____ %:

(A) 40


(B) 50


(C) 20


(D) 30




13. Structure failure occurs nearly ____ %:

(A) 40


(B) 50


(C) 30


(D) 20




14. _____ is a type of hydraulic failure:

(A) Piping


(B) Slope failure


(C) Gullying


(D) Poor pressure




15. _____ is a type of seepage failure:

(A) A & B both


(B) Sloughing


(C) Over topping


(D) Piping




16. Rising of dams refers to:

(A) Increase height of existing dam


(B) Increase number of spillways


(C) Increase width of dam


(D) Increase length of berm




17. Rising of dam is important for hydro power generation:

(A) Flood control


(B) Increase capacity


(C) All of these


(D) Hydro power generation




18. Testing and commission is important in:

(A) None of these


(B) Remedial measures


(C) A & B both


(D) Methodology of rising of dam




19. Due to earthquake:

(A) Failure by spreading


(B) Failure by piping


(C) Failure by wave erosion


(D) Failure by settling down by foundation




20. Slogging is same as ______ when reservoir is full:

(A) Overtopping


(B) Slope failure


(C) Piping


(D) For pressure