MAINTENANCE OF CANALS MCQs – CHAPTER 23 DAE

1. _____ is activity to keep waterway in good condition:

(A) Canal breaches


(B) A & B both


(C) Maintenance of canal


(D) None of these




2. Process of removing silt material from canal is called:

(A) Vegetation


(B) Stabilization


(C) Dragging


(D) Breaching




3. Removal of plants from canal is called:

(A) Stabilization


(B) Vegetation


(C) Dragging


(D) Breaching




4. Gap created in canal bank due to breaking is known as:

(A) Non-stabilization


(B) Breaches


(C) Silting


(D) All of these




5. _____ is a reason of breach:

(A) All of these


(B) Due to leakage and piping


(C) Due to ignorance of cultivator


(D) due to design




6. Silting tank is also known as:

(A) Sedimentation tank


(B) A & B both


(C) Settling basin


(D) None of these




7. Class 1 tanks are _____:

(A) Smallest


(B) Largest


(C) Medium sized


(D) None of these




8. _____ tank is located at entry point:

(A) Outlet


(B) Inlet


(C) Class 3


(D) Class 2




9. Berm is used for:

(A) Control erosion


(B) Divert water


(C) Create boundaries


(D) All of these




10. _____ is main step for a new berm:

(A) Determine purpose


(B) All of these


(C) Choose the material


(D) Clear the site