1. . Cost of any item is determined per unit quantity of work, by:
(A) Estimate
(B) Analysis of rates
(C) Quotation
(D) Tender
2. . The volume of one bag of cement in M.K.S system is:
(A) 0.035 Cum
(B) 0.025 Cum
(C) 0.35 Cum
(D) 0.25 Cum
3. . Volume of one bag of cement is:
(A) 2.00 Cft
(B) 1.50 Cft
(C) 1.75 Cft
(D) 1.25 Cft
4. . Weight of one bag of cement is:
(A) 40 Kg
(B) 50 Kg
(C) 55 Kg
(D) 60 Kg
5. . Dry volume of concrete is always more than its wet volume, by:
(A) 1.45 %
(B) 1.50 %
(C) 1.64 %
(D) 1.54 %
6. . The volume of dry concrete is more than wet, due to:
(A) Voids
(B) Blucking
(C) Shrinkage
(D) All of these
7. . Mostly thickness of cement plastering is kept:
(A) ½ “ (12mm)
(B) 1” (25mm)
(C) 1.5” (38mm)
(D) ¼ “ (6mm)
8. . Volume of cement mortar (dry) is taken for brick masonry:
(A) 30 %
(B) 25 %
(C) 15 %
(D) 35 %
9. . Bricks will be required for one Cum masonry:
(A) 620 No.
(B) 550 No.
(C) 600 No.
(D) 500 No.
10. . Number of bricks taken in 100 Cft masonry work:
(A) 750
(B) 1050
(C) 1350
(D) 1550
11. . A table showing quantity of materials required for a particular work:
(A) All of these
(B) Estimate
(C) Analysis of rates
(D) Material statement
12. . Contractor profit is added in detailed estimate:
(A) 10 %
(B) 8 %
(C) 05 %
(D) 15 %
13. . Which are the overhead charges in rate analysis?
(A) Furniture
(B) All of these
(C) Office rent
(D) Salaries
14. . Number of masons required for 100 Cft brickwork is:
(A) 2.5
(B) 1.5
(C) 2
(D) 1
15. . Dry material is taken for 100 Cft concrete works:
(A) 135
(B) 145
(C) 154
(D) 164