1. . A prepared soil surface which receives traffic load from structure:
(A) Toping
(B) Sub base
(C) Base
(D) Sub grade
2. . This layer is provided if subsoil is weak:
(A) Sub grade
(B) Base
(C) Sub base
(D) Toping
3. . The compulsory part of road structure, to protect the subgrade:
(A) Sub grade
(B) Sub base
(C) Toping
(D) Base
4. . A smooth top surface of road on which traffic moves:
(A) Sub grade
(B) Toping
(C) Base
(D) Sub base
5. . A metaled road without surfacing:
(A) WBM
(B) Earthen
(C) Flexible
(D) Rigid
6. . Transverse slope of road appearing in X-section:
(A) Camber
(B) Country slope
(C) Cross slope
(D) Gradient
7. . Longitudinal slope of a road is called:
(A) Cross slope
(B) Country slope
(C) Gradient
(D) Camber
8. . Construction and expansion joints are provided in case of such road:
(A) Earthen
(B) WBM
(C) Rigid/ Concrete
(D) Flexible
9. . Payment unit of surface treatment is:
(A) % Sft
(B) Sft
(C) Cft
(D) Rft
10. . Land width of arterial/major road:
(A) 110’
(B) 120’
(C) 115’
(D) 125’
11. . Width of bicycle track on road side:
(A) 5.5’
(B) 7’
(C) 6’
(D) 7.7’
12. . Screening (stone dust) required for macadam base:
(A) 10 %
(B) 15 %
(C) 20 %
(D) 25 %